ERPNext Implementation
Requirement study, hosting, module configuration, data migration, custom apps and training — through to go-live and beyond.
Included in this service
Requirement study first
Two weeks of understanding how you work now, before anyone configures anything.
Module-by-module rollout
Accounts and Stock first, then Sales, Purchase, HR and Manufacturing as each one settles.
Data migration with reconciliation
Opening balances and stock tie back to your existing system, and we show you the proof.
Training for the people who use it
Sessions per role, not one long demonstration for everyone at once.
From first call to handover
-
Assess
We audit what you run today — hardware, licences, workloads, pain points and growth plans.
-
Design
A written design with sizing, redundancy, network layout and a clear cost breakdown.
-
Implement
Build and configure in a staging window, with nothing pointed at production until it is proven.
-
Migrate
Workloads move in planned batches, each one verified before the next begins.
-
Handover
Documentation, credentials, runbooks and training for your team.
-
Support
Ongoing monitoring, patching and support under an agreed response time.
Asked often enough to answer here
How long does an ERPNext implementation take?
For a small manufacturer, typically eight to sixteen weeks to first go-live, then module additions after that. The requirement study tells us which end of that range you are at.
Can it run on our own hardware?
Yes, and that is usually what we recommend for manufacturers — ERPNext runs well on a VM in the Proxmox cluster we may already be managing for you.
Talk to an engineer about erpnext implementation
Tell us what you run now. You get a written design and a fixed scope before any invoice.